Kuan Lu's Blog Index of Posts » Web Area »
Info nvidia.jpg
RSS Feed Follow the work that Kuan is doing using RSS
RSS Feed Track the files Kuan uploads with RSS
sorry, fogot one posting
Posted 12 Jun 2006 at 1:45pm to the The Lee-um (Samsung) Museum project
really sorry, today i go up here and found out i only did 14 posting on hand in day.here is the other one, it was saved under a different folder so i fogot to post it up.
Info sectionalview....bmp
renders
Posted 09 Jun 2006 at 1:12am to the The Lee-um (Samsung) Museum project
final renders hand in
Info basememntup.jpg
Info basement2.jpg
Info basement3.jpg
Info basement.jpg
Info basementfar.bmp
Info basementstair....bmp
Info downbasement.jpg
Info exteriorleftb....jpg
Info roof4.jpg
Info stairsfinal.jpg
Info topcool.bmp
Info topfloor.jpg
Info upperview.bmp
Info exteriorright....jpg
every little bit at a time
Posted 14 May 2006 at 9:37pm to the The Lee-um (Samsung) Museum project
trying to get the rendering right. the louver went wrong when I import them to Viz, so i had to make it in Viz.
Sun angle change
Posted 09 May 2006 at 11:45pm to the The Lee-um (Samsung) Museum project
if we change the sun angle to behind camera. the prendering looks more realistic
Info 10.jpg
radiosity test rendering for roof view
Posted 09 May 2006 at 11:29pm to the The Lee-um (Samsung) Museum project
Hand in 4 interim review
Posted 09 May 2006 at 7:53pm to the The Lee-um (Samsung) Museum project
because of my Viz can not work properly, always come up with "cannot find glazed.rad" this sort of file when it is rendering, so most of my renders are just from revit with no materials attached to it. i am going to do the materials all in Viz
Info 1_exterior.jpg
Info 2_exteriorvie....jpg
Info 3_basementvie....jpg
Info 4_basementvie....jpg
Info 6_first_floor....jpg
Info 8_roofview.jpg
Info 7_3nd_floor_s....jpg
Info 9_roofview2.jpg
Info 10_roofview3.jpg
Info 11_site.jpg
Info 12_louver_vie....jpg
Info 12_sitesectio....jpg
Info 13_stairviewu....jpg
Info Lee-um__samsu....ppt
Getting the roof done
Posted 07 May 2006 at 12:52am to the The Lee-um (Samsung) Museum project
the second most comlex part is done. the roof supposed to e covered with louvers, but i am just going to use mapping, otherwise it slows my PC down too much
interiors
Posted 04 May 2006 at 11:28pm to the The Lee-um (Samsung) Museum project
getting the stairs done
Posted 23 Apr 2006 at 2:31pm to the The Lee-um (Samsung) Museum project
the hardest part (i think) in modelling- stairs in Mario Botta building is done.
Info 3nd_floor_sta....jpg
