Dazhi He's Blog Index of Posts » Web Area »
RSS Feed Follow the work that Dazhi is doing using RSS
RSS Feed Track the files Dazhi uploads with RSS
problem with Syncing my website
Posted 11 Jun 2006 at 8:11pm to Dazhi's personal blog
Hi there,
i currently have a problem with Syncing my website. I had my rendering done several days ago and when i put it in my website and Syncing it, it doesn't wrok probably. I am sorry for that, but i will fix it tomorrow.
Finish work
Posted 09 May 2006 at 11:03pm to the Children's Museum project
process
Posted 08 May 2006 at 1:55am to the Children's Museum project
Sorry,
I can't connect to the internet last couple of days.And i cant upload the things i have done. anyway, here is the play leve i had done, followed by the main model. And some break through in the round stairs.
qusetion of the picture
Posted 27 Apr 2006 at 3:07am to the Children's Museum project
Hi,
Thanks for your reply. As you mention we need pictures. Does it mean we need to have picutres for all the space we are going to model? Because i have difficulties in finding all the space' pictures. So far we got 3 out of 6. So we still need the other 3?
Gidday guys
Pictures - we need pictures. I believe that the case has basically been made that you may have enough spaces of the correct type but you need to document this with coloured in sections of the plans showing colour coding of who is doing what AND associating this with the scanned pictures of the relevant spaces...
late submission of the exercises
Posted 18 Apr 2006 at 11:59pm to Dazhi's personal blog
Sorry for the delayed submission. Also sorry not to post my models at the same time as my power point is 2003 version, it can't insert 3d model.
I will upload the models using the school machine soon.
Info Exercise.ppt
Building information
Posted 18 Apr 2006 at 4:19pm to the Yamaguchi Centre for Arts and Media project
Elevations, plans, sections and etc, are all provided. Some of the material information are also given on the book. We also look through the website and find some important information about the skylights' detail. This would be uploaded in a while.
After discussion with my partner Yimeng Wang, we decide each to make one floor model. Yimeng would do the ground floor model, and i will finish the roof and the second floor. As Yimeng has a much faster machine, he will take most of the rendering work.
Building information
Posted 18 Apr 2006 at 4:19pm to the Yamaguchi Centre for Arts and Media project
Elevations, plans, sections and etc, are all provided. Some of the material information are also given on the book. We also look through the website and find some important information about the skylights' detail. This would be uploaded in a while.
After discussion with my partner Yimeng Wang, we decide each to make one floor model. Yimeng would do the ground floor model, and i will finish the roof and the second floor. As Yimeng has a much faster machine, he will take most of the rendering work.
Building information
Posted 18 Apr 2006 at 4:19pm to the Yamaguchi Centre for Arts and Media project
Elevations, plans, sections and etc, are all provided. Some of the material information are also given on the book. We also look through the website and find some important information about the skylights' detail. This would be uploaded in a while.
After discussion with my partner Yimeng Wang, we decide each to make one floor model. Yimeng would do the ground floor model, and i will finish the roof and the second floor. As Yimeng has a much faster machine, he will take most of the rendering work.
