Lee-um Museum Index of Posts »
RSS FeedFollow the work that is produced for this project using RSS
RSS FeedTrack the files uploaded to this project with RSS
Seoul, Korea (South)
breaking up the museum
Posted 02 Apr 2006 at 4:02pm by Emil Ismail
We have decided to break up the museum into two parts. I will be doing the bits in red. The green parts will be done by Yong Wan KIM who is also doing some parts from the mario botta building with Kuan Lu.
Interesting to see how the buildings intersect as there is a tunnel connecting the two buildings together on the first basement.
Info plan_parts.JPG